RFQ stands for request for quotation. That is the whole answer, and if it is all you needed you can stop here. Most people do not stop, because the letters almost never appear alone. Within a paragraph or two you tend to meet RFP, RFI, RFT and ITT as well, along with a portal that wants you to submit something by Friday. This guide takes the abbreviation first and works outwards: what else it can mean, how the family fits together, how to say and write it, and where you are likely to run into it.
Key takeaways
- RFQ stands for request for quotation, spoken as three separate letters: ar-eff-cue.
- It is the buyer's document. The quotation that comes back from a supplier is the reply, not the RFQ.
- RFI, RFP, RFT and ITT are relatives rather than synonyms, and each asks for a different kind of answer.
- A handful of other fields reuse the same three letters, so read the context before assuming.
What RFQ stands for
RFQ stands for request for quotation. Every word in that expansion is carrying weight. It is a request, so the buyer is asking rather than ordering. It concerns a quotation, so what comes back is a price with terms attached rather than an essay about methodology. And it travels outwards, from one buying organisation to several suppliers at once, because the whole point is comparison. Taken together, a request for quotation is a structured invitation asking suppliers to state what they would charge to deliver a clearly defined item or service, on what lead time, and under what commercial terms.
You will see the expansion written two ways. Request for quotation is the more formal and more common form, and it is what you should use in documents and contracts. Request for quote is the same thing in casual speech and in a good deal of software. Neither is wrong, and no supplier will misunderstand you, but consistency inside a single document is worth having. If you want the underlying idea explored in depth rather than defined quickly, our RFQ meaning guide does that job, while this article stays with the abbreviation itself.
The one-line answer. RFQ stands for request for quotation: the document a buyer issues to ask suppliers for a firm price against a specification that is already fixed, so that like can be compared with like.
Other things RFQ can stand for
Three-letter abbreviations are recycled ruthlessly, and RFQ is no exception. If the sentence you are reading is about buying, supply chains, tenders or sourcing, request for quotation is almost certainly correct. Step outside those fields and the odds shift. In construction and engineering procurement, particularly in North America, RFQ sometimes expands to request for qualifications, a pre-bid stage in which firms submit credentials and past project evidence before anyone talks about price at all. That single letter changes the document entirely: one asks what you cost, the other asks whether you are allowed to bid.
In finance and trading systems, request for quote describes an electronic protocol in which a participant asks dealers for a price on a specific instrument and size. The mechanics are recognisably the same, but the timescale is seconds rather than weeks. Academic and technical writing occasionally uses the letters for entirely unrelated phrases, and internal corporate glossaries sometimes invent their own. None of this is a problem in practice, because the surrounding words nearly always resolve it. If you see RFQ next to suppliers, line items, unit prices or lead times, it is a request for quotation.
The practical rule is simple. Check the field before you check the dictionary. A public sector portal, a manufacturing marketplace or a purchasing department is talking about quotations. A pre-qualification round for a bridge contract may not be. If the document itself does not say which expansion it means, the section headings will tell you within a page.
The RFx family compared
RFQ belongs to a group of documents collectively called RFx, where the x stands in for whichever final letter applies. Procurement software often uses RFx as a single menu heading for exactly this reason. The members of the family are not interchangeable, and choosing the wrong one is the most common reason a sourcing exercise produces answers nobody can compare. The table below sets them side by side.
| Acronym | Stands for | What the buyer is asking for | When it is used |
|---|---|---|---|
| RFQ | Request for quotation | A firm price, quantity, lead time and validity period | The specification is already fixed |
| RFP | Request for proposal | A described approach, team, timeline and price | The need is clear but the solution is not |
| RFI | Request for information | Facts about capability, scale and indicative cost | Earliest stage, learning the market |
| RFT | Request for tender | A formal competitive bid under published rules | Regulated or high-value sourcing |
| ITT | Invitation to tender | The same as an RFT, phrased as an invitation | UK, EU and public sector practice |
The clearest way to hold the difference in your head is to ask what a good answer looks like. A good answer to an RFQ is a number, because the buyer has already decided what they want. A good answer to an RFP is a plan, because the buyer knows the problem but not the shape of the fix. A good answer to an RFI is simply information, with nobody committing to anything. RFT and ITT describe the same formal process under two regional names, which is why documents from London and Sydney can look identical while using different letters on the cover.
How to pronounce and write RFQ
RFQ is an initialism rather than an acronym, meaning you say the letters individually and never attempt to pronounce it as a word. Say "ar-eff-cue". A useful habit in meetings is to expand it in full the first time it comes up, then use the letters for the rest of the discussion, which spares anyone new the awkwardness of guessing. The same courtesy applies in writing.
- Capitalisation. All three letters take capitals: RFQ, not rfq or Rfq. When you spell the phrase out in prose, keep it lower case unless it names a specific document: "we issued a request for quotation" but "the Q3 Fastener RFQ".
- Full stops. Modern British and American style both omit them. Write RFQ, not R.F.Q.
- Articles. Use "an RFQ", because the spoken letter R begins with a vowel sound. Use "a request for quotation" when the words are written out.
- Plurals. Add a plain lower case s with no apostrophe: RFQs. The apostrophe form is a possessive, as in "the RFQ's closing date".
- As a verb. Buyers do say "we RFQ'd three suppliers", and it is perfectly clear in speech, but keep it out of formal documents where "issued an RFQ to" reads better.
- First use. In any document a supplier will read, expand the abbreviation once on first appearance and put the letters in brackets after it.
Where the term actually appears
Knowing the expansion is one thing. Recognising the term in the wild is what stops you missing a deadline. The first place most people meet RFQ is inside a procurement system, where it is usually a module or a tab sitting alongside purchase requisitions and purchase orders. In that setting the RFQ is not a Word document at all but a record: a set of line items, a supplier list, a closing date and a comparison screen that ranks the responses when they arrive.
The second place is business marketplaces. Large B2B platforms give buyers an RFQ button that broadcasts a requirement to a pool of registered sellers, who then respond with prices through the same interface. The documents are lighter and the response times are shorter than in traditional sourcing, but the logic is identical. If you have ever asked several online suppliers for a price on the same part, you have run an RFQ whether or not anybody used the word.
The third place, and the most formal, is government and public sector portals. Public buyers are usually bound by rules on how procurement must be advertised and awarded, and those rules often set a value threshold below which a simple RFQ to three suppliers is sufficient and above which a full tender is mandatory. That threshold is why the same council might run an RFQ for office chairs and an ITT for a waste contract in the same week. You will also meet the term in engineering and manufacturing, where an RFQ package typically travels with drawings, tolerances and material specifications attached.
A quick decision guide
If you have arrived at this article because you need to send something and are unsure which letters belong on it, the choice is easier than the vocabulary suggests. Work through these questions in order and stop at the first yes.
Do you already know exactly what you want, down to specification, quantity and delivery point, and is price the main thing you still need to establish? Send an RFQ. Do you know the outcome you want but not the method, so suppliers will differ in how they approach it? Send an RFP. Do you not yet know who can even do this, or what a realistic budget looks like? Send an RFI first and use what comes back to write a better document afterwards. Are you a public body, or bound by a policy that mandates a formal competitive process above a certain value? Then the answer is an RFT or ITT under whatever rules apply to you, regardless of how simple the requirement feels.
One warning worth repeating. Issuing an RFQ when the specification is not genuinely settled is the classic mistake, and it produces a set of prices that cannot be compared because every supplier has quietly quoted for something slightly different. If you find yourself explaining the requirement differently to each supplier, you are not ready to run an RFQ yet. Our complete RFQ guide walks through what a properly prepared request contains before it goes out.
A short glossary of neighbouring terms
These are the abbreviations and terms you are most likely to meet in the same paragraph as RFQ. Keep them to hand for the first few weeks and they will stop looking like alphabet soup.
RFQ
Request for quotation. A request for a firm price against a specification that is already decided.
RFP
Request for proposal. An invitation asking suppliers to propose how they would meet a defined need.
RFI
Request for information. An early, non-binding request used to understand what the market can offer.
ITT / RFT
Invitation to tender or request for tender. A formal call for competitive bids under published rules.
Quotation
The supplier's reply to an RFQ, stating price, terms and how long the offer stands.
PO
Purchase order. The buyer's binding instruction to supply, usually raised after a quotation is accepted.
BOM
Bill of materials. The itemised list of parts an RFQ is often priced against in manufacturing.
Lead time
How long the supplier needs between receiving an order and delivering it.
Turning the abbreviation into a process
Once the vocabulary settles, the work itself is administrative: assembling the specification, choosing which suppliers to approach, sending the same document to all of them, collecting replies that arrive in five different formats, and lining the numbers up so a decision can be defended later. Done in email and spreadsheets, that last part is where the time goes and where errors creep in, because a quotation that quietly excludes freight looks cheaper than one that includes it.
ProcureWave handles that side of it. Requests go out from a single template so every supplier sees identical wording, responses land in a structured comparison rather than an inbox, and the audit trail of who was invited, who replied and why the winner won is captured as you go rather than reconstructed afterwards. Approved quotations convert straight into purchase orders, which keeps the numbers consistent from request through to invoice. You can see how the pieces fit together on our solution overview.
If you are reading this because RFQ turned up in a document and you needed the expansion, you now have it, along with the map of everything sitting around it. And if the next step is working out how to run these properly rather than simply understand them, our team is happy to talk it through. Get in touch through the contact page and we will show you what the process looks like when the admin takes care of itself.
Frequently asked questions
What does RFQ stand for?
RFQ stands for request for quotation. It is a document a buyer sends to suppliers asking for a firm price against a specification that has already been settled. Some organisations expand it as request for quote, which means exactly the same thing. For a fuller treatment of the concept, see our RFQ meaning guide.
How do you pronounce RFQ?
RFQ is an initialism, so each letter is spoken in turn: "ar-eff-cue". It is never said as a single word. In conversation many buyers say "request for quotation" the first time and then switch to the three letters for the rest of the meeting.
Is RFQ the same as a quotation?
No, and the difference matters. The RFQ is what the buyer sends out. The quotation, or quote, is what the supplier sends back. One request typically produces several quotations, which the buyer then compares before placing a purchase order.
Does RFQ always mean request for quotation?
In procurement, purchasing and supply chain contexts, yes. Outside those fields the same three letters occasionally appear as an abbreviation for something else entirely, such as a request for qualifications in construction bidding, so the surrounding context is what settles the meaning.
Is it "a RFQ" or "an RFQ"?
Write "an RFQ". The article follows the sound rather than the spelling, and the letter R is spoken "ar", which starts with a vowel sound. By the same rule you would write "a request for quotation" when the words are spelled out in full.
Want to see this in your own numbers?
Book a tailored demo and we will show ProcureWave running on scenarios that match your business.
Get in touch